PROJECT DATA

Sluice in Dörverden: STB support Frames

Project: Expansion of the Sluice-Complex in Dörverden

Developer: Neubauamt für den Ausbau des Mittellandkanals

Contractor (and Architects): Joint Venture: H. F. Wiebe GmbH & Co. KG, Matthäi Bauunternehmen GmbH & Co. KG, Max Bögl Bauunternehmung GmbH & Co. KG

MEVA Systems: support Frame STB 450, Triplex props, wall formwork Mammut

Formwork Engineering: MEVA Germany, Munich-branch

 
 
1
2
3
4
 

Project

Supporting high-singled wall formwork when pouring the walls of a sluice

STB support frames: Powerful

The MEVA support frames are mainly – but not only – used to support single-sided wall formwork when, for example, pouring against an existing structure. It was near Bremen in Northern Germany where an old ship sluice had to be replaced by a new one with armoured concrete walls 11.70 m high. Single-sided pouring, large-size panel gangs of more than 180 m² and the required dimensional accuracy asked for a very robust, stable and powerful support construction when pouring the sluice walls against soil.

The old sluice was over 100 years old and due to its age could no longer be upgraded and made fit for today’s shipping requirements. Hence it was replaced by a new sluice that has one chamber that is 201 m long and 12.50 m wide. Its usable length is 139 m. Drilled piles were placed next to the soil and anchored to it. Then a 10 cm thick concrete layer was shot onto the piles. In a third step and using MEVA equipment, a 40 cm thick armoured concrete layer was poured next to the shot concrete layer. Largesize wall formwork panel gangs that were 11.75 m high and 15.50 m wide were used to pour the walls in 18 cycles and without leaving any horizontal joints.

Robust and accurate
Twelve support frames STB 450 were used to support the single-sided Mammut wall formwork. The STB 450 is 4.5 m high. Each STB 450 was height-extended to 10.50 m using four height extensions of 1.5 m each. The height extensions have a lattice design which makes them very robust. MEVA Triplex props were anchored to the ground and attached to the STB height extensions to transfer the loads and give the entire support frame construction maximum stability.

 
  • Competencias y Referencias MEVA

    Competencias y Referencias MEVA

    Referencias de obras construidas con encofrado MEVA. Proyectos arquitectónicos. Proyectos de ingeniería civil. Proyectos residenciales y comerciales. Construcción de rascacielos.

  • Fábrica de productos farmacéuticos en Luterbach, Suiza

    Fábrica de productos farmacéuticos en Luterbach, Suiza

    ¡Más rápido, más alto, más eficaz! En lo que fuera la sede de la entonces fábrica de papel Attisholz, en la región norte de Suiza, se viene construyendo una nueva planta biofarmacéutica para el consorcio biotecnológico estadounidense Biogen.

  • Calando hondo por todo lo alto

    Calando hondo por todo lo alto

    En la antigua presa de la periferia berlinesa se viene construyendo un Indoor Skydiving Center, en donde se puede hacer realidad el sueño de volar flotando en el aire suspendido por una corriente de aire generada artificialmente.

  • Losas: 4 semanas antes de lo previsto

    Losas: 4 semanas antes de lo previsto

    En el borde interior de la mesa habían 5 cm que no estaban cubiertos con cara de contacto. De este modo se logró sin mucho esfuerzo la transición al encofrado para losas MevaFlex en el interior de la torre.