PROJECT DATA

New Campus for Central European University in Budapest, Hungary

Owner: The Central European University Foundation, Amsterdam, the Netherlands

Contractor: Moratus KFT, Budapest

MEVA Systems: Wall formwork Mammut, partly with trapezoidal strips, Wall formwork Mammut 350, used and refurbished for architectural concrete finish, Special formwork designs for circular concrete structures

Engineering and support: MEVA Zsalurendszerek Zrt. Budapest, Hungary

 

PROJECT

City Centre: New Building on Historic Grounds

New Campus for Central European University in Budapest, Hungary

The Central European University is a private university accredited in the USA and Hungary. It is based in Budapest. A new campus is being built in the heart of the city near the famous St.-Stephans-Basilika. The design of the new CEU campus blends in with the historic surrounding protected as a world cultural heritage by UNESCO. For this reason, the design was awarded BREEAM certification. The abbreviation stands for “building research establishment environmental assessment methodology“ and is regarded as the oldest method of assessing sustainable development in buildings. CEU is the second university in the whole of Europe to be certified according to this method.

Elliptical staircase with architectural concrete finish

To achieve the architect’s idea of architectural concrete in the staircase, MEVA engineers developed a special formwork design with the all-plastic facing alkus GM6. The walls were climbed on special platforms in 3 m lifts. The concrete finish is spotless.

30 cm slab spanning 6 m

The 30 cm thick slab above the elliptically shaped staircase was supported by special steel beams spanning 6 m. This way, work in the staircase could be continued without interruption.

Dividing walls between new and old building with Mammut 350

The concrete walls separating the new building from the old were poured using Mammut 350 wall formwork, whose panels, 2.5 m wide and 3.5 m high, matched the layout of the wall perfectly. Thanks to the formwork’s heavy duty load capacity of 100 kN/ m² the 7 m high walls could be poured without any speed restrictions and in one go. The panels were tied through the existing walls.

9,53 m high slabs with architectural concrete finish

The high floating roof of the campus auditorium was also poured with a high quality architectural finish and supported by ID15 shoring towers.

Cladded columns

The existing columns were cladded in concrete. Mammut wall panels achieved the 112 x 150 cm footprint and 5.50 m height with a minimum of effort. The architects had a special design in mind for the finish, achieved easily and effectively by mounting birchwood ply facing to the formwork.

 
  • Competencias y Referencias MEVA

    Competencias y Referencias MEVA

    Referencias de obras construidas con encofrado MEVA. Proyectos arquitectónicos. Proyectos de ingeniería civil. Proyectos residenciales y comerciales. Construcción de rascacielos.

  • Fábrica de productos farmacéuticos en Luterbach, Suiza

    Fábrica de productos farmacéuticos en Luterbach, Suiza

    ¡Más rápido, más alto, más eficaz! En lo que fuera la sede de la entonces fábrica de papel Attisholz, en la región norte de Suiza, se viene construyendo una nueva planta biofarmacéutica para el consorcio biotecnológico estadounidense Biogen.

  • Calando hondo por todo lo alto

    Calando hondo por todo lo alto

    En la antigua presa de la periferia berlinesa se viene construyendo un Indoor Skydiving Center, en donde se puede hacer realidad el sueño de volar flotando en el aire suspendido por una corriente de aire generada artificialmente.

  • Losas: 4 semanas antes de lo previsto

    Losas: 4 semanas antes de lo previsto

    En el borde interior de la mesa habían 5 cm que no estaban cubiertos con cara de contacto. De este modo se logró sin mucho esfuerzo la transición al encofrado para losas MevaFlex en el interior de la torre.