PROJECT DATA

Battersea Development in London City

Project: Residential complex with 866 appartments at Battersea Power Station in London

Developer: Battersea Power Station Development Co., London Contractor Byrne Bros. (Formwork), Teddington

MEVA Systems: MEVA Guided Climbing MGC, Wall formwork Mammut 350, Circular system formwork Radius, Circular formwork Rundfix

Formwork engineering: MEVA Formwork Systems, Haiterbach and Tamworth, UK

 
 
1
2
3
4
5
 

Project

London Skyline: MEVA Climbing High

MEVA guided climbing system MGC appears on central London skyline

Construction is underway on a new residential complex with 866 apartments in the shadow of the historic Battersea Power Station in central London.

This part is Phase 1 of an extensive development project on 40 acres around the station, which itself is being refurbished. Byrne Bros. Formwork chose the MEVA guided climbing system MGC to construct the two circular staircases and four lift shafts.

Unusually shaped stair cores with class B concrete finish

The unusual shape of the stair cores and the requirement of a class B finish led MEVA to provide a purpose-built shutter using the Rundfix circular formwork combined with alkus facing. The shutter’s internal radius was just 2.3 m, so using system formwork was no option. The all-plastic facing alkus is ideal when a top concrete finish is required. It is rolled like steel but is lighter and more flexible, allowing customer requirements to be matched exactly.

Minimum crane time: Only 90 min. for a lift from floor-to-floor

Byrne Bros. Formwork selected MEVA’s guided climbing system MGC, which provides a safe working environment. It also reducess crane time to only 90 minutes for a lift from floor to floor. Platforms and formwork connections are very robust and fully adjustable, allowing the specified tolerances to be kept accurately. The MGC, combined with MEVA’s flagship system Mammut 350, needs only a single 3.5 m x 2.5 m panel from ground to roof for fast pours up to 100kN/m².

Circular formwork system Radius

During planning, it was quickly agreed to combine lift shaft and stair riser in one unit to save time and resources and to speed up the cycles. The MEVA Rundfix was combined with the Radius system, whose panel heights match those of the Mammut 350. Aligning ties and joints is simple, further speeding up the climbing process.

Planning and design with MEVA expertise helps speed up workflow

MEVA worked extensively with Byrne Bros. Formwork to match planning, design and delivery to the site’s requirements. On MEVA’s advice, Byrne Bros. chose the pre-assembly method, assembling all platforms and main components outside the critical path. Thus the site was ready to climb within 2 days after the first pour. By working outside the main construction site, Byrne Bros. were able to work at ground level throughout. The assembly of the finished platforms is then very simple, requiring very little crane time.

 
  • Competencias y Referencias MEVA

    Competencias y Referencias MEVA

    Referencias de obras construidas con encofrado MEVA. Proyectos arquitectónicos. Proyectos de ingeniería civil. Proyectos residenciales y comerciales. Construcción de rascacielos.

  • Fábrica de productos farmacéuticos en Luterbach, Suiza

    Fábrica de productos farmacéuticos en Luterbach, Suiza

    ¡Más rápido, más alto, más eficaz! En lo que fuera la sede de la entonces fábrica de papel Attisholz, en la región norte de Suiza, se viene construyendo una nueva planta biofarmacéutica para el consorcio biotecnológico estadounidense Biogen.

  • Calando hondo por todo lo alto

    Calando hondo por todo lo alto

    En la antigua presa de la periferia berlinesa se viene construyendo un Indoor Skydiving Center, en donde se puede hacer realidad el sueño de volar flotando en el aire suspendido por una corriente de aire generada artificialmente.

  • Losas: 4 semanas antes de lo previsto

    Losas: 4 semanas antes de lo previsto

    En el borde interior de la mesa habían 5 cm que no estaban cubiertos con cara de contacto. De este modo se logró sin mucho esfuerzo la transición al encofrado para losas MevaFlex en el interior de la torre.