PROJECT DATA

Mühlbach Bridge on ICE-Railway Line
Nuremberg–Berlin

Project: Mühlbach bridge on the new ICE railway line lilnking Nuremberg and Berlin

Owner: Deutsche Bahn AG (state railway)

Contractor: Alpine Deutschland AG, Niederlassung Halle-Leipzig

MEVA Systems: Hands-set formwork EcoAs, wall formwork Mammut,   beam formwork, climbing platform KLK 230, shoring system MEP

Formwork engineering: MEVA Schalungs-Systeme
GmbH, Munich branch

 
 
1
2
3
4
5
 

Project

One Formwork Unit for 8 Column Dimensions

The Mühlbach bridge is one of many bridges and tunnels being built on the railway line that will link Germany's capital Berlin with Nuremberg. 

The bridge over the Mühlbach river spans 175 m and has a hollow carriage carrier with a width of 14.30 m. 

The contractor used the flexible, modular but very sturdy hand-set system EcoAs to pour the foundations for the four columns that support the bridge. Heavy duty wall formwork Mammut was employed for the abutment. 

Hollow bridge pylons tapering 70:1 

The bridge pylons measure up to 6.50 m by 3.50 m at the base. Once their height of 17,90 m is reached, they have taper at a rate of 70:1. Corners and indentations remain constant. Tapering so strongly, the pylons represented a considerable formwork challenge to the MEVA engineers. They came up with a special construction using the working platform KLK 230. Its unique feature was that the forming units could be contracted step for stap to accomodate the tapering size of the pylons. This proved the most cost-effective method, since only one set of forming units was required for the entire height of the pylon pour. 

Hollow pylon shafts and pylon heads

Inside their hollow shaft, the pylons have  pedestals. To form them, MEP shoring towers were placed inside and were extended as the pylons were poured higher. Finally, once the pylon head had to be poured, the shoring tower proved a welcome support.

 
  • MEVA Kompetenz & Referenzen

    MEVA Kompetenz & Referenzen

    Referenzen zu Projekten im Wirtschafts- und Wohnungsbau, Hochhausbau, Architekturbau und Ingenieurbau

  • Biogen biopharmazeutische Produktionsanlage in Luterbach bei Solothurn, Schweiz

    Biogen biopharmazeutische Produktionsanlage in Luterbach bei Solothurn, Schweiz

    Höher, schneller, rationeller: Auf dem Areal der ehemaligen Papierfabrik Attisholz in Luterbach bei Solothurn entsteht eine neue biopharmazeutische Produktionsanlage für den US-Biotechkonzern Biogen.

  • Sichtbeton mit Mietschalung: Es geht!

    Sichtbeton mit Mietschalung: Es geht!

    Die Umgestaltung der Radolfzeller Innenstadt geht mit der Entwicklung eines neuen Wohnquartiers auf dem Schiesser Areal weiter. Ein Vorteil der MEVA Lösung: Hier entstehen zehn Wohnblöcke mit 2 bis 4 Geschossen, insgesamt 99 Wohneinheiten und einer Wohnbaufläche von 10.000 m².

  • La Mer, Jumeirah: Top Ergebnis bei Stützmauer

    La Mer, Jumeirah: Top Ergebnis bei Stützmauer

    Das La Mer-Projekt ist eines von vielen ehrgeizigen Infrastruktur- Vorhaben, mit dem die Vereinigten Arabischen Emirate ihr Image als moderner, aufstrebender Standort untermauern wollen.